The vB Geek

Go Back   The vB Geek > vB Geek Commons > Testing Ground > Articles

Articles Test GARS articles

Advertisement
This is an HTML example. Isn't it just wonderful?!?!
  Learn how to remove ads

Comment
 
Article Tools Display Modes
Just another test
Just another test
Author Byline
Published by KenDude
11-16-2009
Post New Page


Cable Routing

The next installation step is the cable routing. The cables from the runways must be routed into and through the cross members, around the pulleys and up into the columns to be attached at the adjustment point at the top of each column. This was the only step of the installation that required some disassembly of the factory hardware that had already been installed in order to feed the cables through properly. Here are some images of that process:

HAD TO REMOVE PICS TOO MANY FOR A SINGLE POST LIMITED TO 7

It may not show up well in the photos but each cable is routed through a tensioner that locks against the cable and keeps it in a locked position. This is the secondary cable lock system and not found on low end products. This is a requirement for ALI certification to the ANSI standards. If there is a failure of the primary load suspension mechanism (the cable), the locks will automatically engage. Here is a picture of that mechanism:
Custom field tests
The 'on' Title
on
The 'ah' Title
ah
What goes into a this Text Field?

Article Tools
Show Printable Version  Email this Page 

Contents
<<  <    (Page 5 of 5)    > >>
Comment

Article Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 08:06 PM.


Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.

Article powered by GARS 2.1.9 ©2005-2006